Configuring WorkCenter Status Parameters

Use the Transaction Set Maintenance form to configure parameters for the WorkCenter Status transaction.

  1. Open the Transaction Set Maintenance form.
  2. Select SF WorkCenter Status from the grid.
  3. Specify this information:
    Fill Warehouse
    Select this check box to pre-fill the warehouse on the transaction with the warehouse assigned to the user. The user can change this warehouse for a specific transaction if needed.
    Successful Message
    Select this check box to show a success message when the transaction is successfully completed.
  4. On the Transaction Parameters tab, in the Parameter and Value columns, configure these parameters:
    High Efficiency Level
    Select this check box to update the percentage of the highest efficiency level of the selected workcenter.
    Medium Efficiency Level
    Select this check box to update the percentage of the medium efficiency level of the selected workcenter.
    Refresh Interval
    Select this check box to assign minutes to the refresh interval period of the workcenter..
  5. Click Save.