Budget vs Actuals by Project/ Activity/ Control Code
The Budget vs Actual by Project/ Activity/ Control Code report displays the actual cost against the available budget for the project, at the control code level.
To generate the report, specify:
- Company
The code of the company.
- Currency Type
The type of the currency used for the project.
- Project
The code of the project for which the report is generated.
- Activity
The activity linked to the project.
The report displays:
- Control Code
The control code linked to the project.
- Currency
The project currency.
- Budget
The budget allocated to the selected project. This is the Bottom-up budget specified in Infor LN (all budgets are considered, irrespective of the status).
- Actual Cost
The actual cost incurred on the project.
- Balance Budget
- Amount
The balance amount calculated using the formula:
(Budget - Actual Cost)
- %
The balance amount expressed as a percentage:
((Budget - Actual Cost)/ Budget))*100
- Amount