Using APS to Backward Schedule
To optimize the resource usage in this manner, the Scheduling activity must see all the simultaneous demands for the resources; therefore, you must run it independently of the APS Planning activity. As such, it does not support "real-time" scheduling of new demands.
If you are more interested in quick and more real-time scheduling than in resource optimization, you may consider using the backward scheduling capabilities of the APS Planning activity. APS produces a simple backward schedule to generate planned orders.
See the topic About the Planning Process for a detailed description of the APS planning algorithm). With the Use Planning Output for Scheduling option, you can use this planning data for your schedule. In this situation, scheduling is done simultaneously with planning and you can observe the real-time effects on the usual scheduling output forms and reports.
Setup
The system must be in Infinite APS or APS planning mode. The MRP planning mode does not support this feature.
To set up the system to send planning output to the scheduling analysis forms and reports, select the Use Planning Output for Scheduling parameter, located on the APS tab on the Planning Parameters form.
When this parameter is selected, you cannot run the Scheduling activity to generate a schedule.
Generating the Schedule
To generate the full schedule, run APS Planning. The planning results are loaded automatically into the database tables used by the Scheduling output forms and reports. In addition, the job operation start and end dates calculated by APS Planning are displayed on the Job Operations form.
To update the schedule for incremental changes to the plan (such as for the addition of new orders, jobs, and Get ATP/CTP plans), open the Update Schedule form. Click the button to load the incremental plan changes into the Scheduling output forms and reports.
See the APS Overview topic for a description of the criteria used to generate this schedule output.
Viewing Scheduling Output
After running APS Planning, you can view scheduling output on these forms and reports:
- Resource/Resource Group Dispatch List report
- Resource Utilization
- Resource Group Utilization
- Resource Schedule
- Resource Group Schedule
- Resource Sequencing
- Resource Group Sequencing
- Resource Gantt Chart - Scheduler
The Scheduling activity generates schedule data that displays on additional output forms and reports that are not supported by the Use Planning Output for Scheduling option.