Kanban Console page

Use the Kanban Console Details page to view the Kanban console.

Facility
Name of the destination issuing demand to which parts are to be sent.
Part Status
The status of the part that indicates whether the number of signals are matching the loop size, maximum, and minimum established for the part. See the legend on the Kanban console for further information.
Ship To
Name of the shipping destination to which parts are to be sent.
Part Number
Part number as established by the customer.
Pull Loop Size
The number of Kanban signals that can be active for a single part, excluding emergency signals. When defining a Kanban part for the first time, this is the number of signals generated. The recommended calculation for pull loop size is:
 Pull Loop = (ADVV * (DF + MT + TT + OP) + SS ) / STD.PACK ADV = Average Daily Volume (based on MRP data) ADVV = ADV * Vendor's split DF = Delivery Frequency Time (in days) MT = Manufacturing Process Time TT = In-transit Time OP = Order Process Time SS = Safety Stock In Days STD.PACK = Standard Pack
Minimum Number of Pull Signals
The minimum required number of Kanban signals in the In-Transit and In-House status.
Standard Pack
The required number of parts per Kanban signal.
Created Signals
The number of signals that have been created, but not yet sent to the supplier as demand.
At Supplier Signals
The number of signals that have been sent to the supplier as demand.
In-Transit Signals
The number of signals against which the supplier has shipped, but which have not yet been received at the customer Ship To.
In-House Signals
The number of signals for which the customer has received a shipment, but for which parts have not been consumed.
Consumed Signals
The number of signals for which the customer has used the parts during manufacturing, but for which a new signal has not yet been generated.
Related topics