Setup SMI Part page
Use the Setup SMI Part page to add SMI parts.
- Facility
- Name of the destination issuing demand to which parts are to be sent.
- Ship To
- Name of the shipping destination to which parts are to be sent.
- Supplier
- The company responsible for supplying and shipping the part.
- Part
- Part number as established by the customer.
- Planner
- The customer user responsible for maintaining the specific part's inventory. When attaching a planner to a part, previously entered planners can be selected from the list. To add a planner, select and specify the planner's name in the field that displays.
- Supplier Managed Inventory Minimum
- The lowest acceptable number of parts for the customer to have on-hand.
- Supplier Managed Inventory Maximum
- The highest acceptable number of parts for the customer to have on-hand.
- Quantity on Hand
- The number of parts currently in the customer's inventory.
- Average Daily Release (ADR)
- The average number of parts required through releases per day.
- Average Daily Usage (ADU)
- The average number of parts consumed during manufacturing per day.
- In Transit Days
- How long, in days, a shipment of the part takes to arrive at the Ship To location. If left blank, the value defaults to zero (0).
- Type
- Whether the part is used in manufacturing (Production) or for operations (Service).
- Status
- An indicator of the part's purpose.
- Consignment. The part is processed and returned.
- Build-out. Model year build out; the part run is nearing its end.
- None. Neither consignment or model year build out.
Related topics