Process page
Use the Process page to view the process details.
- Defect Quantity
- The number of defective parts received.
- Status
- The current status of the operation.
- Operation
- Name of the operation.
- Duration
- The number of days the supplier requires to complete the operation.
- Part In/Out
- The part number before the operation is performed on the part and the part number after the operation is complete.
- Contractor
- The supplier acting as an outside contractor for the operation.
- In-Transit to Contractor
- The number of parts currently in-transit to the contractor.
- Shipper Number
- A unique number to identify the shipper. After the shipper is created, the shipper number cannot be edited.
- Ship Date & Time
- The date the shipment will be sent. Defaults to the current computer system date.
- Estimated Arrival Date
- When the shipment is currently calculated to arrive at the checkpoint based on updated checkpoint information.
Related topics