Kanban Parts page

Use the Kanban Parts page to edit the Kanban part details.

Supplier
The company responsible for supplying and shipping the part.
Facility
Name of the destination issuing demand to which parts are to be sent.
Ship To
Name of the shipping destination to which parts are to be sent.
Planner
The customer user responsible for maintaining the specific part's inventory. When attaching a planner to a part, previously entered planners can be selected from the list. To add a planner, select New and specify the planner's name in the field that displays.
Part Number
Part number as established by the customer.
Pull Loop Size
The number of Kanban signals that can be active for a single part, excluding emergency signals. When defining a Kanban part for the first time, this is the number of signals generated. The recommended calculation for pull loop size is:
Pull Loop = (ADVV * (DF + MT + TT + OP) + SS ) / STD.PACK ADV =
				Average Daily Volume (based on MRP data) ADVV = ADV * Vendor's split DF =
				Delivery Frequency Time (in days) MT = Manufacturing Process Time TT =
				Intransit Time OP = Order Process Time SS = Safety Stock In Days STD.PACK =
				Standard Pack
Minimum Number of Pull Signals
The minimum required number of Kanban signals in the In-Transit and In-House status.
Standard Pack
The required number of parts per Kanban signal.
PO Number
The purchase order number associated to the requirements.
Model Year
Code associated with the part that indicates to which run it belongs.
Engineering Level
Customer defined code indicating the required version of the part that is associated to the requirements.
Create Emergency Signals
The number of emergency Kanban Signals to create. Emergency signals can cause the Pull Loop Size to be exceeded.
Create New Signals to Match Pull Loop Size
If selected, new signals are created so that the number of total signals equals the established Pull Loop Size.
Lead Time
The amount of time added to the current system time (in days, hours, and minutes) to determine the due date of the pull signal parts.
Delivery Days
The days on which shipments are delivered. If selected, day or days will be included in the Lead Time when calculating the Due Date. If the day is not selected, it is skipped and is not included in the Lead Time.