Open the
Resources overview window by selecting
Factory > Resources.
Click
New at the bottom of the
Resources overview window.
A dialog box is displayed.
Enter a unique code for the new resource.
Click
OK.
The
Resource Entry window is displayed. The
General tab is selected by
default.
Enter the description for the resource in the entry window.
Select a timetable from the drop-down list box.
Define the minimum and maximum volume/weight.
Enter the maximum batch duration.
Note: The maximum batch duration is taken into account in tank
batches and in process batches. You can also define the maximum tank batch
duration at the process step level. If both values are entered, the smaller of
the two is used.
Click
OK to save your changes
and close the window. Alternatively, continue populating tabs on this window.