Machine and Labor Time

This column chart compare the actual machine and labor time for the manufacture of a selected product (or product group) with the estimated machine and labor time, for the specified period. The chart also displays the total hour's utilization.

Click to filter the data as required.

Click to view the Detail report.

Detail Report

The first column of the report lists the name of the items for which the machine and labor time is generated. Click to view the report based on Item or Workcentre dimension.

For both machine hours and labor time, the table displays:

  • The actual time and estimated time for the selected period.
  • The variances in the estimated time and actual time as an absolute value and as a percentage.