Estimated vs Actual Duration

In this report, the column chart compares the planned hours with the actual hours for the specified period. The Overrun percentage trend is displayed as a line.

Click to filter the data as required.

Click to view the Detail report.

Detail Report

The first column of the report lists the name of the items for which the duration measures are generated. Select the measure based on which the spreadsheet displays the values for all the items for the specified period. The measures are:

  • Duration plan
  • Duration actual
  • Lead time variance
  • Lead time ratio
  • Overrun percentage
  • Overrun