SC001 |
Check the validity of each of the module hierarchy selections. Modules that are not selected are flagged. Or, if a previously
selected location hierarchy is deleted, the selection is no longer valid and the value is NULL in the Cycles page and is flagged.
|
Warning |
Cycle period [cycle]-[period] with the [module] module and the required fields, which are not completed. The [module] module
is unavailable.
|
SC004 |
Check for a calendar selection in the cycle period. If the user deletes the calendar that is defined in the cycle, the selection
is no longer NULL and is flagged .
|
Incomplete |
Cycle [cycle] with no Calendar defined. |
SC005 |
Check for a calendar level to store the scenario values in the cycle period. If the user updates the selected calendar, the
level selection can be invalid. For example, the removal of the quarters from the selected calendar can generate an error,
if the quarters are the default calendar level. The selection is no longer valid and the value is NULL.
|
Incomplete |
Cycle [cycle] with no Calendar level defined. |
SC007 |
Check for an item hierarchy in the cycle period. If the user deletes the selected item hierarchy, the selection in Cycles is no longer valid and the selection is marked NULL.
|
Incomplete |
Cycle period [cycle]-[period] with no Item Hierarchy defined. |
SC008 |
Check for an item hierarchy level to store scenario values in the cycle period. If the user updates the selected item hierarchy,
the selection can be invalid. For example, the removal of a level from the selected hierarchy can generate an error. The selection
is no longer valid and is marked NULL .
|
Incomplete |
Cycle period [cycle]-[period] with no Item Hierarchy level defined. |
SC009 |
Check for a base currency in the cycle period. If the currency from MDM is deleted, the selection in Cycles is no longer valid and the selection is marked NULL.
|
Incomplete |
Cycle period [cycle]-[period] with no Base Currency defined. |
SC040 |
Check for a periodicity selection. If the user updates the selected calendar, the level selection can be invalid. For example,
the removal of the quarters from the selected calendar can generate an error, if quarters are the periodicity setting for
this cycle. The selection is no longer valid and is marked NULL, which leads to this error.
|
Incomplete |
Cycle [cycle] with no periodicity defined. |
SC041 |
Check for a cycle process selection. If the user deletes the selected cycle process, the selection is no longer valid and
is marked NULL. The cycle can be created successfully without a process definition, but data is blank and can differ from
the expected result, if a process is previously defined.
|
Warning |
Cycle period [cycle]-[period] with no cycle process defined. |
SC042 |
Check the validity of the scenario process selection, for each default scenario. If the user deletes the selected scenario
process, the selection is no longer valid and is marked NULL. As the default scenarios are versioned, at the time of creating
a cycle period (not starting), this check must be made against the cycle definition and the creation of a new cycle period
must be prevented.
|
Incomplete |
Cycle [cycle] with a default scenario [scenario] and no scenario process defined. |
SC043 |
Check the validity of the initialization macro selection for each default scenario. It the macro is deleted, the selection
is no longer valid and is marked NULL. The status is set to Warning, because the scenario is successfully created without
a workflow, but may differ from the expected result if a workflow is previously defined.
|
Warning |
Cycle period [cycle]-[period] with a default scenario [scenario], and no initialization macro defined. |
SC045 |
Check for an update of the cycle definition for the version linked to the current cycle period. |
Updated |
Cycle differs from the version used in Cycle Period [cycle] - [period]. Updates are effective from the start of the next Cycle
Period.
|
SC047 |
Check for an update of the calendar for the version linked to the current cycle period, where applicable. |
Updated |
Calendar [calendar] differs from the version used in Cycle Period [cycle] - [period]. Updates are effective from the start
of the next Cycle Period.
|
SC048 |
Check for an update of the measure for the version linked to the current cycle period. |
Updated |
Measure [measure] differs from the version used in Cycle Period [cycle] - [period]. Updates are effective from the start of
the next Cycle Period.
|
SC049 |
Check for an update of the calculation rule for the version linked to the current cycle period. |
Updated |
Calendar Rule [rule] differs from the version used in Cycle Period [cycle] - [period]. Updates are effective from the start
of the next Cycle Period.
|
SC050 |
Check for an update of the note type for the version linked to the current cycle period. |
Updated |
Note Type [type] differs from the version used in Cycle Period [cycle] - [period]. Updates are effective from the start of
the next Cycle Period.
|
SC051 |
Check for an update of the planning hierarchy for the version linked to the current cycle period, where applicable. |
Updated |
Planning Hierarchy [hierarchy] differs from the version used in Cycle Period [cycle] - [period]. Updates are effective from
the start of the next Cycle Period.
|
SC052 |
Check for an update of the cycle process for the version linked to the current cycle period, where applicable. |
Updated |
Cycle Process [process] differs from the version used in Cycle Period [cycle] - [period]. Updates are effective from the start
of the next Cycle Period.
|
SC053 |
Check for an update of the workflow for the version linked to the current cycle period, where applicable. |
Updated |
Workflow [workflow] differs from the version used in Cycle Period [cycle] - [period]. Updates are effective from the start
of the next Cycle Period.
|
SC074 |
Check that the cycle is set up to start automatically (Process is Started > Manually), but the Next Period field is empty (NULL). In this case, the application cannot automatically create periods for this cycle because the period
that must be started cannot be determined. The user must edit the cycle definition and set a valid Next Period value or set Process is Started to Manually.
|
Warning |
Cycle [cycle] with the automatic 'Process is Started' setting, however the Next Period is not determined. No new cycle periods
are started by the system until the Next Period is populated with a period value. (Configuration \ Cycle). If automatic creation
of new cycle periods is not required set 'Process is Started' = Manually.
|
SC075 |
Check the status of the calendar in Cycles. If the status is Invalid due to a failure during the creation of calendar buckets, an issue is raised.
|
Incomplete |
Cycle period [cycle]-[period] is using calendar [calendar] with a status = "Invalid". Revise the calendar definition and correct
the problem before starting the cycle period.
|
SC077 |
Check for new calendar definitions against the version used in the current cycle period. The message is only generated for
cycles with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Calendar [calendar] is added during the current cycle period. These changes are effective from the next Cycle Period. |
SC078 |
Check for new measure definitions against the version used in the current cycle period. The message is only generated for
cycles with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Measure [measure] is added during the current cycle period. These changes are effective from the next Cycle Period. |
SC079 |
Check for new calculation rules against the version used in the current cycle period. The message is only generated for cycles
with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Calculation Rule [rule] is added during the current cycle period. These changes are effective from the next Cycle Period.
|
SC080 |
Check for new planning hierarchy definitions against the version used in the current cycle period. The message is only generated
for cycles with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Planning Hierarchy [hierarchy] is added during the current cycle period. These changes are effective from the next Cycle Period.
|
SC081 |
Check for new cycle process definitions against the version used in the current cycle period. The message is only generated
for cycles with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Cycle Process [process] is added during the current cycle period. These changes are effective from the next Cycle Period.
|
SC082 |
Check for new scenario process definitions against the version used in the current cycle period. The message is only generated
for cycles with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Scenario Process [process] is added during the current cycle period. These changes are effective from the next Cycle Period
|
SC083 |
Check for deleted cycle definitions against the version used in the current cycle period. This only applies to the deleted
cycle.
|
Updated |
Cycle Definition [cycle] is deleted during the current cycle period. These changes are effective from the next Cycle Period.
|
SC084 |
Check for deleted calendar definitions against the version used in the current cycle period. The message is only generated
for cycles with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Calendar [calendar] is deleted during the current cycle period. These changes are effective from the next Cycle Period. |
SC085 |
Check for deleted measure definitions against the version used in the current cycle period. The message is only generated
for cycles with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Measure [measure] is deleted during the current cycle period. These changes are effective from the next Cycle Period. |
SC086 |
Check for deleted calculation rules against the version used in the current cycle period. The message is only generated for
cycles with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Calculation Rule [rule] is deleted during the current cycle period. These changes are effective from the next Cycle Period.
|
SC087 |
Check for deleted planning hierarchy definitions against the version used in the current cycle period. The message is only
generated for cycles with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Planning Hierarchy [hierarchy] is deleted during the current cycle period. These changes are effective from the next Cycle
Period.
|
SC088 |
Check for deleted cycle process definitions against the version used in the current cycle period. Message is only generated
for cycles with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Cycle Process [process] is deleted during the current cycle period. These changes are effective from the next Cycle Period.
|
SC089 |
Check for deleted scenario process definitions against the version used in the current cycle period. The message is only generated
for cycles with the status = Running (not Aborted, Completed, Pending).
|
Updated |
Scenario Process [process] is deleted during the current cycle period. These changes are effective from the next Cycle Period.
|
SC096 |
Check the cycle process linked to a cycle. If a cycle process setup is invalid, the start of the cycle period is prevented.
|
Incomplete |
Cycle [cycle] using cycle process [cycle process] with an invalid setup. Revise the cycle process and rectify before the creation
of a new cycle period for this cycle.
|
SC098 |
Check the planning hierarchies linked to a cycle. If a planning hierarchy setup is invalid, the start of the cycle period
is prevented.
|
Incomplete |
Cycle using hierarchy "{0}" with a status = "Invalid". Revise the hierarchy and rectify before starting the cycle period.
|
SC101 |
Check the code lists used for planning hierarchies in a cycle period. If a code list setup is invalid, the start of the cycle
period is prevented.
|
Incomplete |
Cycle period [cycle]-[period] is using a planning hierarchy [hierarchy] based on Code List [code list] setup is invalid. Revise
the Code List and rectify before starting the cycle period.
|
SC102 |
A module defined in Cycles does not contain measures. This prevents the creation of the measure dimension in the cube, causing problems. At least one
measure must be defined for each module.
|
Incomplete |
Cycle period [cycle]-[period] contains a module [module] that does not have measures defined. Disable this module in the Cycle,
or define at least one measure for this module.
|
SC103 |
The additional planning hierarchy definitions must be complete. If a planning hierarchy that is in use by a cycle as an additional
hierarchy is deleted, this leads to an incomplete definition.
|
Incomplete |
Cycle period [cycle]-[period] with an incomplete additional planning hierarchy definition for module [module]. |
SC104 |
The additional pivot attribute definitions must be complete. If a code list or code list attribute is deleted that is in use
by a cycle as an additional pivot attribute, this leads to an incomplete definition.
|
Incomplete |
Cycle period [cycle]-[period] with an incomplete additional pivot attribute for [Description]. |
SC105 |
The previous cycle period must be valid prior to starting a cycle period, based on all valid completed cycle periods. |
Incomplete |
Cycle period [cycle]-[period] with an invalid cycle period selected previously. |
SC106 |
If the cycle process is set to start automatically, check that the previous cycle period can be calculated. |
Warning |
Cycle period [cycle]-[period] with an automatic 'Process is Started' setting. However, the previous cycle period cannot be
calculated.
|
SC107 |
If an additional Pivot Attribute is defined in the cycle, all elements of the selected code list must be populated for that
attribute. If a null value exists for any element in the corresponding code list, the cube is not populated correctly.
|
Incomplete |
Cycle period [cycle]-[period] with an additional pivot attribute defined [code list].[attribute], which contains undefined
values for elements within the code list. All code list elements must be populated for this to be a valid additional pivot
attribute for this cycle.
|
SC108 |
Check the note type for a mandatory note during unlock and save changes. If a note type that is in use by a cycle is deleted,
this leads to an incomplete definition.
|
Incomplete |
Cycle period [cycle]-[period] with the Force Add Note on Unlock selected but no valid Default Note Type selected. Select a
new note type or clear the Force Add Note on Unlock option
|
SC109 |
Check the note type for a mandatory note during worksheet recalculation. If a note type that is in use by a cycle is deleted,
this leads to an incomplete definition.
|
Incomplete |
Cycle period [cycle]-[period] with the Force Add Note on Recalculate selected but no valid Default Note Type selected. Select
a new note type or clear the Force Add Note on Recalculate option
|
SC124 |
Check the measures that are used in a cycle. If the setup for the measure is invalid, the start of the cycle period is prevented.
|
Incomplete |
Cycle period [cycle]-[period] is using a measure [measure] with an invalid setup. Revise the measure and correct the problem
before starting the cycle period.
|
SC125 |
Check the calculation rules that are used in a cycle. If the calculation rule setup is invalid, the start of the cycle period
is prevented.
|
Incomplete |
Cycle period [cycle]-[period] is using a calculation rule [rule] with an invalid setup. Revise the calculation rule and correct
the problem before starting the cycle period.
|
SC126 |
Check to ensure that the location hierarchy selection for each module is a planning hierarchy with defined levels, as the
bottom level of each module's location hierarchy is used as the level to store scenario values.
|
Incomplete |
Cycle period [cycle]-[period] is using a location hierarchy [hierarchy] with no levels defined. Revise the location hierarchy
selection for module [module] and correct the problem before starting the cycle period
|
SC127 |
Verify that at least one module hierarchy is selected for a cycle. |
Incomplete |
Cycle "{0}" with no location hierarchies defined. Define a location hierarchy for at least one module. |
SC128 |
Verify that the cycle has a valid combination of modules (location hierarchies selected). If a planning hierarchy is removed,
the combination of modules can become invalid for a cycle.
|
Incomplete |
Cycle has an invalid planning hierarchy selection of ("{0}", "{1}", "{2}", "{3}"). Revise the cycle and select location hierarchies
for a valid combination of modules.
|
SC131 |
Check to ensure that any additional pivot attributes that are defined against the cycle do not contain values longer than
71 characters.
|
Incomplete |
Cycle [cycle] with an additional pivot attribute defined [code list].[attribute], which contains elements greater than 71
characters. Modify each element to be not more than 71 characters for this attribute.
|
SC135 |
Create a set in the OLAP dimensions that corresponds to each level in the planning hierarchies used by a cycle, using Set
and the level name (for example, Set_Level4Items). You must check if all the hierarchies for a dimension have a unique level
name, wherein the code list differs. A same code list and level name can be used because you create the set for a unique code
list. Level1 of a hierarchy is not checked as this contains a single element (no Set required).
|
Incomplete |
Cycle has {0} hierarchies "{1}" with a non-unique level "{2}" that does not validate the {3} data cube. Edit the hierarchies
to make all non-root levels unique.
|
SC139 |
Check if all the node/level names referenced by business metrics are valid when the cycle period is started/resumed. |
Incomplete |
Cycle contains a business metric "{0}" which refers to invalid "{1}" with names: "{2}" |
SC140 |
Check additional hierarchies in comparison with the cycle hierarchies that do not have levels shared with the primary hierarchy,
above the base level, and are not in sequence (consecutive) from the base level and higher.
|
Incomplete |
Cycle includes hierarchies "{0}, {1}" with shared elements which are non-consecutive from the base level upwards. For shared
elements, the child levels must also be shared in both hierarchies up to the base level. ({2})
|
SC141 |
Check additional hierarchies defined in comparison with the cycle hierarchies that have the same parent definitions for any
shared levels. Different hierarchies can have different parent attributes and therefore, parent-child associations. Primary
and Additional hierarchies in the Cycle with different parent-child relations for the shared levels are not allowed. The top
shared level can have a different parent.
|
Incomplete |
Cycle includes hierarchies "{0}, {1}" with shared elements on two or more levels; however some shared child levels are linked
to different parent levels in the two hierarchies. ({2})
|
SC142 |
Check if any additional location hierarchies have a suitable primary location hierarchy defined for the specified module.
There is no restriction on defining an additional hierarchy within any module.
|
Warning |
Cycle with an additional hierarchy "{0}" of type location for module {1}, although the correspondent primary hierarchy is
not defined. This additional hierarchy is ignored.
|
SC143 |
Check additional hierarchies to ensure that the root node is not the same as the primary hierarchy. Hierarchies can share
levels from the base. However, the root node must be different.
|
Incomplete |
Cycle includes hierarchies "{0}, {1}" with shared elements which are non-consecutive from the base level upwards. For shared
elements, the child levels must also be shared in both hierarchies up to the base level. ({2})
|
SC145 |
Check that each rolling period definition contains a calendar that is valid for the current cycle, based on the primary calendar
or additional period hierarchies.
|
Incomplete |
Cycle "{0}" with a Rolling Period "{1}" which uses a calendar that does not match either the primary calendar "{2}" or any
calendars referenced in additional planning hierarchies "{3}".
|
SC146 |
Check that each rolling period definition is linked to a valid periodicity selection, based on the cycle periodicity and calendar
level, to store scenario values. The selected periodicity must be between these ranges.
|
Incomplete |
Cycle "{0}" with a Rolling Period "{1}" and a periodicity below "{2}". |
SC147 |
Validate that all nodes between all period hierarchies defined for the cycle level are unique (except the shared bottom level).
|
Incomplete |
Cycle with period hierarchies "{0}" which contain a non-unique node "{1}" that does not validate the {2} data cube. |
SC149 |
Check business metrics for the cycle to ensure that the base measure is also enabled for this cycle. |
Warning |
Cycle has a business metric "{0}" which references a measure "{1}" that is not enabled for the cycle. |
SC150 |
Check whether the current planning period can be defined. |
Incomplete |
Cycle Period "{0}" with no available planning periods. |
SC151 |
Check whether each forecast engine is linked to a default parameter code list. This is required for each forecast engine defined,
however, if the user deletes the code list defined in the forecast engine, the selection is no longer valid and is marked
NULL and flagged.
|
Warning |
Forecast engine {0} with no default parameter code list defined. |
SC152 |
|
|
Calculation rule with module {0} and calculation sequence {1} with neither Filter nor Measure defined. |
SC153 |
|
|
Planning hierarchy "{0}" with a status = "Building". The processes for the hierarchy must be executed prior to starting a
new cycle period.
|
SC154 |
|
|
Calendar "{0}" with a status = "Building". The processes for the calendar must be executed prior to starting a new cycle
period.
|
SC164 |
Check whether a Market Intelligence record for which
the tag is set to enabled in a cycle, references any measures for which
tags are not enabled for the same cycle. In this situation, the MI
record is invalid and is not created at the start of a cycle
period.
|
Warning |
Cycle has an enabled Market Intelligence {0} which
references measures {1,2,3 ...} that are not enabled for the cycle.
Enable the relevant tags in the Cycle Configuration window.
|
SC165 |
Check whether multiple MI records using the same
measure/module are set to enabled for the same cycle. In this situation,
the MI records are invalid and are not created at the start of a cycle
period.
|
Warning |
Cycle has more than one enabled Market Intelligence
record for module "{0}" using the same measure "{1}
|
SC166 |
Check whether multiple enabled MI records with the same
Net Forecast Measure are set to Edit Net Forecast Directly. The Net
Forecast Measure can only be edited directly in one MI record. In this
situation, the MI records are invalid and are not created at the start
of a cycle period.
|
Warning |
Cycle has more than one enabled Market Intelligence
record for module "{0}" using the same Net Forecast Measure "{1} set to
Edit Net Forecast Directly.
|
SC168 |
Check whether a calculation rule is
based on a measure which is defined as a Market Intelligence record. In
this situation, the calculation rule is invalid and is not created a the
start of a cycle period.
|
Warning |
Cycle has an enabled Calculation rule {0} which is
based on a measure {1} that is defined as a Market Intelligence record.
Update the Calculation rule accordingly.
|
SC169 |
Check whether a calculation rule is
based on a measure which is defined as a Transactional Data record and
both are enabled for the same cycle. In this situation, the calculation
rule is invalid and is not created at the start of a cycle
period.
|
Warning |
Cycle has an enabled Calculation rule {0} which is
based on a measure {1} that is defined as a Transactional Data record.
Update the Calculation rule accordingly.
|
SC170 |
Check whether a measure is defined as
a Transactional Data record and is enabled in a cycle, which also is
defined as a Market Intelligence record and enabled for the same cycle.
In this situation, the measure is invalid and the configuration cannot
be completed.
|
Incomplete |
Cycle has an enabled measure {0} which is defined as a
Transactional Data record and a Market Intelligence record. Measure can
only be used in one definition.
|
SC176 |
If a Replenishment Engine is defined, check that the
engine is enabled for the cycle. If the engine is not enabled, the
engine is not available for selection for the cycle.
|
Warning |
Cycle has a Replenishment Engine {0} which is not
enabled for the cycle.
|