E-Item Revisions by MBC (tiedm3540m000)

Use this session to display which E-item revisions are linked to a mass bill of material change (MBC)). You can see details in the E-Item Revisions by MBC (tiedm3540m000) details session.

You can link revisions, or delete a link, to an MBC line in the E-Item by MBC (tiedm3122m000) session.

Field Information

MBC Number

The code of the MBC to which revisions are linked.

Order Status

The MBC's status.

Engineering Item

The E-item whose revisions are linked to the MBC. For more details, double-click the E-item.

Description

Engineering Item Revision

The E-item revision, which is linked to the MBC.

Status

The status of the revision.

Engineering items

Effective Date

effective date

Expiry Date

When the revision is no longer valid.

Engineer

The employee responsible for the revision.

E-Item Revision Text

a text is present.

To view the text, click the Text button.

Material

What the revision is made of, for example paper, plastic, or wood.

BOM Quantity

BOM quantity

Size

How large the revision is. For example 200 mm x 1 meter.

Unit Set

unit set

Standard

The company, national or international standard to which the revision conforms (or must conform). For example, ISO 8601, NEN 3140, BS 1383.

Unit

unit

Weight

Weight.

Related topics
Engineering items
Changing EBOMs - Automatic procedure
Engineering data management summary