Example: Multi-Job Proration

This topic provides an example of multi-job proration.
  8 9 10 11 12 1 2 3 4
Job 100 ******** ******** ********                ******** ******** ********    
Job 200 ******** ********              
Job 300   ******** ********   ******** ********      
Job 400         ******** ******** ******** ******** ********

Total Run Times:

Job Hours
Job 100 6.0
Job 200 2.0
Job 300 4.0
Job 400 5.0
TOTAL 17.0 hours
Times Job 100    Job 200    Job 300    Job 400    TOTAL
8-9 0.50 0.50      
9-10 0.33 0.33 0.33    
10-11 0.50   0.50    
12-2 0.66   0.66 0.66  
2-3 0.50     0.50  
3-5       2.00  
TOTAL 2.50 0.83 1.50 3.16 8.00hrs