Completing an inspection task at the facility level

  1. Select a facility from the Facility field.
  2. Select Execution > Task Inspection Completion to open the YMS Facility Task Inspection Completion page.
  3. Select a record and click Complete to open the YMS Complete Inspection page.

    The inspection sequence can be canceled at any time, but any answers, images, or reason codes specified during the inspection are erased.

  4. Select a record in the list.
  5. If the inspection passed, then go to next step. If the inspection failed the inspection, click the Inspection Passed check box to clear the check mark.
  6. Click Upload to load images taken during the inspection. Uploading an image is required if the inspection question fails.
  7. If the inspection question failed, click Add Reason Code.
  8. In the Inspection Reason Code dialog, select a reason code and use the arrow in the Available column header to move the code to the Selected column.
  9. Click OK.
  10. ClickClick button to sign.
  11. Do one of these tasks to sign off on the inspection:
    • Use the mouse to sign signature and click Accept Signature. You can click Save Signature to save it.
    • Click Use Saved Signature
  12. Click Complete.