Creating a move task at the facility level
-
Select a facility from the
Facility field.
-
Select to open the YMS Facility Equipment Requests page.
-
Select a record to create the move request.
-
If not already specified, specify this information on the Assignments tab:
- Assigned Equipment ID
- Select the equipment ID for the equipment carrier.
-
Click Create Move Task.
-
Specify this information:
- Priority
- Specify the priority for this task.
- Auto Complete
- Select the check box to auto complete task in desired time frame.
Otherwise, clear the check box to manually complete the task.
- Auto-Complete In
- Specify the duration of time before the task is
auto-completed.
-
Click OK.
- If the equipment and location
combination is not valid, or the requested move cannot be generated, then an
error is displayed.
- If no valid equipment can be used to
satisfy the request or a move cannot be created, you can select Send Move Failure to respond with a move
fail message.
- If the equipment and location combination is valid, a move task is created to
bring the equipment to the load or unload location indicated in the host system
move task request. When the equipment move is completed, a move complete
message is displayed.
- Click Send Confirm Stage if the
equipment is moved to the load or unload location in advance of the receipt of
the move task request.