Splitting putaway tasks for assigned pick location

  1. Select Putaway from the RF device Main menu.
  2. Click Standard LPN. The Putaway (PA03A) screen is displayed.
  3. Specify LPN.
  4. Press Enter. The Confirm Put (PA02AS) screen is displayed.
    Note: This screen is displayed only if:
    • The value is specified in the Minimum required % of LPN quantity field of the Putaway Detail screen.
    • The Dimension Restrictions field is set to None.
  5. Specify this information on the Confirm section:
    Loc
    The Assigned Pick location based on the strategy.
    Note: You cannot modify this field.
    Loc
    The Pick Location to be specified for confirmation.
    LPN Qty
    The total quantity of LPN.
    To Qty
    The quantity to be moved to the final location.
  6. Press Enter. The specified quantity is moved to the final To location and redirected to the Confirm Put (PA02AS) screen. You can move the remaining quantity with LPN from the staging location to the other location based on the putaway strategy.
    Note: 
    • If the Pick location configured with Lose ID is enabled, the specified quantity is moved to the Pick location.
    • If the Pick location is not configured with Lose ID is disabled, an error message is displayed.