Scenario #3 - Full pallets, remaining quantity match, minimize picks
- Rotate by Lottable04 (manufacture/receipt date)
- Quantity Ordered = 117
- Shelf Life - not applicable
- Date Code Days = 30
- Pack Quantity
- 1 Case
- 25 Pallets
- General Strategy Rules
- Allocate a license plate with a quantity that matches the quantity needed
- Select full pallet quantity by Lot, Location ABC, Location, then LIFO time in location
- Sort non pallets by LPN quantity with lot rotation, Location ABC, then Location
Scenario #3 Inventory
- Sorted initially by System Lot to identify lots that are not valid since they are outside date code days (30)
- Inventory selected by allocation highlighted in yellow
Scenario #3 Results
- Get full pallets based on Lottable04 (manufacture/receipt date), location ABC, and location
- Quantity match where possible (none found)
- Get non full pallet quantity LPNs based on lottable04, low to high quantity, location ABC, and location
Inventory selection process:
- Allocation Pass #1
- Qty to allocate = Qty 117
- Qty selected = 25; LPN 103 from location B101
- No LPN matched the quantity to allocate
- Include only full pallet quantity LPNs by (a) Lot04, (b) Location ABC, ©) Location
- Allocation Pass #2
- Qty to allocate = Qty 92
- Qty selected = 25; LPN 104; location B101
- No LPN matched the quantity to allocate
- Include only full pallet quantity LPNs by (a) Lot04, (b) Location ABC, ©) Location
- Allocation Pass #3
- Qty to allocate = Qty 67
- Qty selected = 25; LPN 106; location B130
- No LPN matched the quantity to allocate
- Include only full pallet quantity LPNs by (a) Lot04, (b) Location ABC, ©) Location
- Allocation Pass #4
- Qty to allocate = Qty 42
- Qty selected = 25; LPN 110; location B120
- No LPN matched the quantity to allocate
- Include only full pallet quantity LPNs by (a) Lot04, (b) Location ABC, ©) Location
- Allocation Pass #5
- Qty to allocate = Qty 17
- Qty selected = 17; LPN 101; location B130
- No LPN matched the quantity to allocate
- Quantity needed less than full pallet (25) so skip pallet step
- Select LPNs for
non-pallet quantity (<> 25)
- Bigger fit rule requires LPN quantity > 17 (quantity needed)
- LPN 101 is oldest lot closest to the quantity needed (qty = 20)