Enabling Labor System settings

To calculate engineered labor standards, you must activate the LABORENGINEINSTALLED setting. For the labor reports to determine which day to record an associate’s work, you must update the labor cutoff system setting.

Standards are available for the following work:

  • Assisted Putaway
  • Directed Putaway
  • Assisted Cycle Counts
  • Assisted Loading
  • Assisted Unload LPN
  • Cycle Counts
  • Loading
  • Production Cycle Count
  • Supervisor Cycle Count
  • Directed Picking
  • Directed Dynamic Picking (Pallets)
  • Assignment Picking
  • Cluster Picking
  • Directed Replenishment
  • Receiving
  • RF-assisted Dynamic Picking
  • RF-assisted Move