Running the Schedule Effectiveness Summary Report
The Schedule Effectiveness Summary Report lets you assess the coverage and efficiency of a schedule based on whether a predefined interval is understaffed or overstaffed.
- Select My Reports > Schedule Optimization Reports > Analysis Reports > Schedule Effectiveness Summary Report to run the report on demand.
- Specify this information:
- Location
- Select the locations to include in the report. Note: Sublocations are always included to the lowest level (department).
- Start Date
- Select the start date for the report when running the report on
demand. The default is today's date.Note: You cannot specify an end date. The date range of the report is always one week.
- Highlight Coverage less than %
- Specify the threshold percentage for highlighting the cells in the report based on coverage. A coverage percentage is displayed for each day in the date range. When coverage for a department is less than the specified value, the coverage percentage is highlighted in the report. The default threshold percentage for coverage is 85.
- Highlight Efficiency less than %
- Specify the threshold percentage for highlighting the cells in the report based on efficiency. An efficiency percentage is displayed for each day in the date range. When efficiency for a department is less than the specified value, the efficiency percentage is highlighted in the report. The default threshold percentage for efficiency is 75.
- Schedule Report
- Select this check box when scheduling the report. The check box
does not apply when running the report on demand.Note: You must select this check box when scheduling the report so that the system date is used to calculate the date range.
- Start Date Offset
- Specify a negative or positive offset to the start date when
scheduling the report. The offset is ignored when the Schedule Report
check box is cleared.
By default, the offset is 0. In this case, the start date of the report is determined by the system date.
If you specify an offset other than 0 (with the Schedule Report check box selected), the start date of the report is determined by
system date + offset
.For example, to return data starting one week in the future, specify an offset of 7. If the current day is September 5, then the start date of the report is September 12.
- Show Parameters
- Select Yes to show the selected parameters at the top of the report.
- Report Format
- Optionally, select the output format of the report (HTML, PDF, or Excel). The default is HTML.
- Click Go to run the report.