Case 2

If Employee B is scheduled to work two shifts on the same day (Shift 1- 10:00 AM to 12:00 PM, Shift 2- 2:00 PM to 4:00 PM), the Schedule Validation report returns a violation. This is because the sum of the two shifts (2 + 2 = 4) is greater than 3 hours.