Shortening or lengthening a schedule

  1. Select Maintenance > Optional Modules > Schedule Bidding > Schedule Bid Setup > Create/Manage Schedule Bid.
  2. Select the schedule bid to use as a basis to shorten or lengthen a schedule and click Edit.
    Note: The status must be SCHEDULED to shorten or lengthen a schedule bid.
  3. To shorten a schedule, select SHORTEN.
  4. To make a schedule longer, select LENGTHEN.
  5. Update the End Date and Time field.
    If SHORTEN is selected, the new end date must be before the current end date. If LENGTHEN is selected, the new end date must be after the current end date.
  6. Click Save.
    Note: Schedules are shortened or lengthened only when the Simple Rotation Bidding Assignment task is running. After a schedule bid is processed, the status updates to Scheduled Short or Scheduled Long when shortening or lengthening is successful. If an error occurs, the status updates to Shortening Error or Lengthening Error, depending on the action performed. A notification is generated based on these status updates, ensuring visibility of the outcome.