Configuration Details
To configure the Budget rule:
- Set the budget type for the location using the Location Setup page.
- Set the schedule rules to use either of the following staff rules (Scheduling > Schedule Optimization > Schedule Rules— Staff Rules):
- Constraint: Use location budget methodology
- Constraint: Do not exceed budget