Key Components
These components are used for staffing requirements or viewing the results of your search in the Staffing Requirement Results table:
- Effective End After
-
Date filter to specify the end date for staff requirements that are effective within a specified time range. The range is specified using this filter and the Effective Start Before filter.
- Effective Start Before
- Date filter to specify the start date for staff requirements that are effective within a specified time range. The range is specified using this filter and the Effective End After filter.
- Activity
- An activity for the requirement.
- Job
- A job for the requirement.
- Skill
- A skill for the requirement.
- Driver Type
- The type of work that drives the requirement.
- Volume Type
- The parameter for tracking business volume.
- Property
- The property used to track a property-driven requirement.
- Skill Level
- The skill level preferred to perform the staffing requirement’s activity.
- Shift Start Offset
- Indicates the amount of time to add to the start of every shift before it starts covering workload.
- Shift End Offset
- Indicates the amount of time to add to the end of every shift after it stops covering workload.
- Sort Order
- Determines how the record is displayed in the Workload by Day Part form. If the Sort Order field is left blank, the record is sorted alphabetically according to the value specified in the Description column.