Editing labor metrics
You can view or configure the labor metrics applied to a row in a Master Rotation (MR) or One-time Schedule (OTS) using the Assignment and Labor Metrics panel. Changes to the labor metrics apply for the entire effective duration of the row. When the schedule is not in a status that allows labor metric changes, the labor metric fields are read-only.