Scheduling a report
- Select My Reports > Scheduled Reports.
-
Click Schedule
Report beside the report that you want to schedule.
If the report is already scheduled, then the existing schedule is shown.
-
Click Create
New Criteria.
The selection parameters for the report are displayed. The parameters that you see depend on the report.
- Specify a name for the report in the Criteria Name field.
- Specify the selection parameters for the scheduled report.
- Click Save.
- Click Schedule Report Run Times.
- Click Add Schedule.
-
Specify this information:
- Schedule Name
- Specify the name of the scheduled report run job.
- Task Affinity
- Select the name of the server that is responsible for the task processing.
- Send on
- Specify the scheduled time for the report to be sent. The time is based on the time zone that is specified.
- Timezone
- Specify the time zone for the scheduled time.
- Send to users
- Specify the recipients of the report. If this field is blank, then the report is created, but no messages are sent.
- Distribute to lists
- Specify the distribution lists that you want to send the report to.
- Individual copy
- Indicate whether you want to send an individual copy of the report to each employee. This is only applicable if the report has been set up to generate data for specific employees.
- Email Report as Attachment
- Optionally, select this check box to send the report to the
recipients as an attachment to an email. The email is sent to the
recipient's external email address. The recipients will also receive
a workmail notification with a link to the report result.
If this check box is not selected, then the recipients will only receive the workmail notification.
- Report Format
- Select the output formats of the report (HTML, PDF, or
Excel). By default, all three report outputs are
produced on the report server. To improve performance and reduce
content storage, select only the output formats that you require.
This field does not apply to burst reports that only generate HTML output, or to the Payroll Based Journal Export for CMS report, which only generates Excel output.
-
In the Scheduling
Time section, select one of these options:
- Once: The report will run only once. If you select this option, then you must run the report manually.
- Daily: The report will run at intervals of one or more
days. There are two ways to specify the interval at which the report
runs:
- Specify the number of days between runs in the Every __ Day(s) field.
- Specify the number of seconds between runs in the Interval __ Second(s) field. A minimum of 5 seconds between runs is allowed. (A value of-1 indicates that the field is not used).
- Weekly: The report will run on the selected days each week.
- Monthly: The report will run on the specified day of
the selected months. You can enter a specific date on which the report
will run, such as the 12th, or you can select a week and day of the
week, such as the second Thursday.Note: If you specify a date that is greater than the total number of days in a month, then the report runs on the last day of the month. For example, if a report is scheduled to run on the 30th of each month, then it will run on the 28th or 29th in February.
-
In the Scheduling
Range section, specify the start and end dates of the period in
which the schedule will run.
Leave the End By field blank to schedule the report to run indefinitely.
- Click Submit.
- Click OK.