CLOCKS_REQUIRED_FOR_LABOR_METRICS_CHANGE
- Description
-
This parameter controls whether separate clock swipes are required to change the labor metrics applied to the work details between clock on and off times.
When set to True, a separate clock swipe is required to change the labor allocation. The labor allocation applied at the time of the ON clock is carried forward to the OFF clock.
When set to False, the original default labor allocation is used for the work details between clock on and off times. If employee default labor allocations are split between multiple labor metrics, the labor allocation changes between clock on and off times without additional clock swipes.
- Valid values
-
True, False
- Default value
-
False
- Location
-
system/WORKBRAIN_PARAMETERS/
- Effective
-
Fixpack 12