Adding jobs in an MR/OTS template

  1. From Scheduling, select Multi-view Scheduler > Master Rotation > Manage Master Rotation.
    To open an OTS template, follow the same path and select Multi-view Scheduler > One-time Scheduler.
  2. Select a Master Rotation template and click Edit.
  3. Right-click a job row and select Before or After.
  4. Specify the Number of Rows.
  5. Click Load.
  6. Specify the area where the added job rows should be included.
    You can only select active areas. If the MR/OTS template does not include any areas, the Area section is not available when adding a row. By default, the Area field displays the value associated with the row from which it was selected.
  7. Click Submit.