Enabling the Load Jobs check box to be visible

  1. Navigate to Scheduling > Multi-view Scheduler > Schedule Template > Schedule Templates.
  2. Specify the Unit and Date.
  3. Click Load.
  4. Click the Turn ON config mode icon.
  5. Click the plus sign (+) to create an ad-hoc shift.
  6. Click the orange diamond icon next to the Load Jobs check box.
  7. In Field UI Configuration, go to Field UI and select CheckboxUI from the list.
  8. Click Save.