Creating schedule periods
You can define additional schedule periods to determine the start date of the first schedule period and the duration of each schedule period.
- Select Maintenance > Schedule Settings > Schedule Period.
- Click Create New Entry.
- Specify a name for the schedule period in the Schedule Period field.
-
To create a schedule period with a one week or multiple week duration, specify
this information:
- Is Month-based
- Clear this check box.
- Duration
- Specify the number of weeks that are included in a single schedule period in the drop-down.
- Start Date
- Select the start date for the first schedule period.
-
To create a schedule period with a one month duration, specify this
information:
- Is Month-based
- Select this check box. This configures teams using this schedule period to consider each calendar month as an individual schedule period.
- Duration
- Specify 1. If any other value is
specified, then this field is set to 1 upon
saving. Note: Schedule periods spanning multiple months are not supported.
- Start Date
- Select the system minimum date of 01/01/1900. If any other date is specified, then this field is set to the system minimum date upon saving.
- Click Save.
The schedule period is saved and can be associated with
teams.