Creating schedule periods

You can define additional schedule periods to determine the start date of the first schedule period and the duration of each schedule period.

  1. Select Maintenance > Schedule Settings > Schedule Period.
  2. Click Create New Entry.
  3. Specify a name for the schedule period in the Schedule Period field.
  4. To create a schedule period with a one week or multiple week duration, specify this information:
    Is Month-based
    Clear this check box.
    Duration
    Specify the number of weeks that are included in a single schedule period in the drop-down.
    Start Date
    Select the start date for the first schedule period.
  5. To create a schedule period with a one month duration, specify this information:
    Is Month-based
    Select this check box. This configures teams using this schedule period to consider each calendar month as an individual schedule period.
    Duration
    Specify 1. If any other value is specified, then this field is set to 1 upon saving.
    Note: Schedule periods spanning multiple months are not supported.
    Start Date
    Select the system minimum date of 01/01/1900. If any other date is specified, then this field is set to the system minimum date upon saving.
  6. Click Save.
The schedule period is saved and can be associated with teams.