Key Components

These components are used for staffing requirements or viewing the results of your search in the Staffing Requirement Results table:

Effective End After

Date filter to specify the end date for staff requirements that are effective within a specified time range. The range is specified using this filter and the Effective Start Before filter.

Effective Start Before
Date filter to specify the start date for staff requirements that are effective within a specified time range. The range is specified using this filter and the Effective End After filter.
Activity
An activity for the requirement.
Job
A job for the requirement.
Skill
A skill for the requirement.
Driver Type
The type of work that drives the requirement.
Volume Type
The parameter for tracking business volume.
Property
The property used to track a property-driven requirement.
Skill Level
The skill level preferred to perform the staffing requirement’s activity.
Shift Start Offset
Indicates the amount of time to add to the start of every shift before it starts covering workload.
Shift End Offset
Indicates the amount of time to add to the end of every shift after it stops covering workload.