Workload or productivity value

Before attempting to define volume-driven requirement, you must obtain the workload or productivity value. The workload or productivity value is derived by a source outside of the application. This value is typically obtained through internal research or a consultant. For more information about obtaining the productivity value, consult Infor Consulting Services.

These components are used with volume-driven requirements:

Driver Type
Select Volume-Driven.
Driver
A driver for the requirements.
Description
A brief description of the requirements.
Workload/Productivity

A number representing the workload value for the volume-driven staffing requirement.

The workload or productivity value must be obtained from a source outside of the application. For more information, consult Infor Consulting Services.