Workload or productivity value
Before attempting to define volume-driven requirement, you must obtain the workload or productivity value. The workload or productivity value is derived by a source outside of the application. This value is typically obtained through internal research or a consultant. For more information about obtaining the productivity value, consult Infor Consulting Services.
These components are used with volume-driven requirements:
- Driver Type
- Select Volume-Driven.
- Driver
- A driver for the requirements.
- Description
- A brief description of the requirements.
- Workload/Productivity
-
A number representing the workload value for the volume-driven staffing requirement.
The workload or productivity value must be obtained from a source outside of the application. For more information, consult Infor Consulting Services.