Design considerations for labor forecasting
Each driver uses a forecast method to determine how the system will predict the future volumes. Those volumes will then be spread across the hours of the day using a distribution. A productivity standard is then applied to those distributed volumes to come up with the number of employees required for each interval. That final workload number is then used during scheduling.