Error messages
You can view the logs in the Job Scheduler or the Import Transactions page for errors during a MVS Shift Configuration Import. See "Job Scheduler" in the Infor Workforce Management Time and Attendance Implementation and Administration Guide.
This table lists the possible error messages for a MVS Shift Configuration Import:
Error Message | Description |
---|---|
Shift Name exists | The Shift Name exists already exists in the system. Note: Only new shifts can be imported. Edits and updates are not
allowed.
|
Cannot create multiple Shift Attributes within a Shift | Only one shift attribute can be created per shift during import. |
Unrecognized type | The Import Type field does not contain a valid value. |
Invalid date format | The date format is invalid. |
String field values exceeding permitted width for FIELD_NAME | The entered string field values exceed the permitted width for a particular field. |
Invalid FIELD_NAME | The specified referenced value does not exist in the system.
Note: For example, when importing the day part, the shift
attribute must already exist in WFM.
|
Missing required field {FIELD NAME} | One or more required fields are missing. |
A row belonging to a Shift was specified non-contiguously | A row belongs to a shift but was specified as non-contiguous. |
Cannot specify multiple Shift Teams within a Shift | Only one shift team can be specified per shift during import. |
Shift Label cannot be added because it already exists | A shift label that already exists within the system cannot be added during import. |
Missing import type IMPORT_TYPE | The required import types are missing. |
At least one minute of the shift has no activity. | The specified activity start and end times do not add up to cover the entire shift from start to end. |
If any configuration is to be applied to child teams, the Apply to Sub-teams flag should be checked in the Shift row | The Apply to Sub teams field is N but a shift team is specified. |
If Apply to Sub-teams flag is checked in the Shift row, configuration for child teams must be specified | The Apply to Sub teams is Y but a shift team is not specified. |