Configuring how locked days affect overrides
You can set how locked days affect overrides. Locked days include days that are locked manually from the timesheet and days that are locked by the Hands Off and Supervisor dates.
Overrides that span locked days can result in two outcomes:
- An override error is generated for the entire date range.
- Overrides are applied to the "open" days in the date range and only generate errors for the locked days. These overrides can be edited or deleted before submitting the timesheet.
To set how locked days affect overrides, configure the CREATE_ONE_DAY_OVERRIDES registry parameter. Specify True to generate errors for the entire date range if at least one of the days is locked. Specify False to generate errors only for the days in the date range that are locked.
See the Infor Workforce Management Registry Parameter Reference Guide.