Forecasts

Labor forecasts determine the level of staff required for coverage during each interval of the schedule period. Auto-Assignment strives to create a schedule that satisfies the required staff levels determined by the labor forecast. A labor forecast is required to create a schedule that is optimized around the estimated demand for each department. If labor forecasts are not available or necessary, the schedule can be created based on the minimum staff requirements specified for each department.