Editing labor metrics

You can view or configure the labor metrics applied to a row in a Master Rotation (MR) or One-time Schedule (OTS) using the Assignment and Labor Metrics panel. Changes to the labor metrics apply for the entire effective duration of the row. When the schedule is not in a status that allows labor metric changes, the labor metric fields are read-only.

  1. Edit an MR or OTS.
  2. Click inside the Employee column for the row you would like to edit.
    The Assignments and Labor Metrics panel is displayed.
  3. Select the Labor Metrics tab.
  4. Edit the labor metric fields as needed.
  5. Optionally, specify a comment for the row in the Comment field.
  6. Save the MR or OTS.