Configuration Details

To configure the Budget rule:

  1. Set the budget type for the location using the Location Setup page.
  2. Set the schedule rules to use either of the following staff rules (Scheduling > Schedule Optimization > Schedule Rules— Staff Rules):
    • Constraint: Use location budget methodology
    • Constraint: Do not exceed budget