Productive hours and standard hours columns

Column Group Heading Single Column Heading Name on the Layouts Detail Page Column Name on the Layouts Detail Page Editable by Default Source
Productive Hours Staffing Requirements Hours STAFF REQUIREMENT HOURS FCIT_STF_ REQ_HRS no The total workload required. This value is based on workload generation data from LFSO that is aggregated to the SO_RESULTS_SUMMARY table. The value uses the same workload generation mechanism as in LFSO and the same staffing requirements, except that in LFSO the value is calculated for a week, and in the Budget Creation module the value is calculated for a year.
Productive Hours Variable Coefficient VARIABLE COEFFICIENT FCIT_PR_ FACTOR no This value is calculated in the layout. The value is the ratio between Staffing Requirement Hours and Volume Driven Hours. See Variable Coefficient Column.
Productive Hours Variable Hours VARIABLE HOURS FCIT_VAR_ HRS yes

Variable Hours = Staffing Requirement Hours - Minimum Hours

Increasing this value increases the amount of hours dedicated to events and volume-driven work, which are in addition to the minimum required hours. Decreasing this value indicates that fewer hours are required than indicated by workload generation.

Productive Hours Minimum Hours MINIMUM HOURS FCIT_MIN_ HOURS no This number originates in the reference budget. The number indicates the minimum hours for fixed-shift, permanent employees at a location, according to the Corporate Finance office. If the total hours is less than this number, then by default, you cannot lock the budget. This value is specified by the VALIDATE MIN HOURS business rule. See VALIDATE MIN HOURS Rule.
Standard Hours Additional Events Hours ADDITIONAL EVENTS HOURS FCIT_EVT_ HRS no Derived from LFSO mandatory events.
Standard Hours Volume Driven Hours VOLUME DRIVEN HOURS FCIT_VOL_ DRV_HRS no Volume Driven Hours = Variable Hours + Minimum Hours + Event Hours