Modifying shifts in schedule bids

To modify the shifts in a schedule bid:

  1. Select Maintenance > Optional Modules > Schedule Bidding > Schedule Bid Setup > Create/Manage Schedule Bid.
  2. Click Edit beside the schedule bid to which you want to modify shifts.
  3. In the Schedule Bid Shifts section, modify the fields, as required.
  4. Click Save.