Modifying shifts using Staffing Center

You can modify shifts in the Staffing Center. For example, you can extend the length of a shift by 2 hours.

  1. Select the unit or position where you want to modify a shift.
  2. Click the cell in the shift that you want to modify.
  3. Specify your modifications by selecting from the menu provided, or specifying text.
    When lengthening a shift, if the result of the edit would cause a partial overlap with another shift of the same employee, you will receive a warning message indicating the impacted shift(s). The warning message visually presents the shift overlap situation, as well as the resulting schedule if the overlap is managed. If you proceed with the edit transaction, then the impacted shift(s) will be shortened to accommodate the transaction as shown in the warning, resulting in consecutive shifts.

    For example, an employee is scheduled with two shifts on the same day, 7:00 to 15:00 and 15:00 to 23:00. If you extend the earlier shift by 2 hours (ending shift at 17:00 instead), then the start time of the later shift will be changed to 17:00 to accommodate the shift edit.

    Note: If the overlap completely covers an impacted shift, then the shift edit is not permitted and an error message is displayed. Similarly, the shift edit is not permitted if the overlap includes booked off time with another shift.