Job Scheduler Report

This table describes the content of the Job Scheduler Report:
Criteria fields Description
  • Job ID
  • Date Selection
  • Start Date
  • End Date
  • Show Parameters
  • Report Format
The report lists the scheduled jobs that ran within the specified date interval. For each job, processing details, the job definition, the job schedule, and the run history are listed. The job definition includes the job name and the Java class that corresponds to the job. The schedule detail includes the next scheduled run time and the schedule interval. The job run history includes the last run date/time, the execution time, and the number of failures in the error log.