Running the Payroll Variance Report
- Select My Reports > Schedule Optimization Reports > Analysis Reports > Payroll Variance Report to run the report on demand.
-
Specify this information:
- Location
- Select the locations to include in the report.
- Start Date
- Select the start date for the report.
- End Date
- Select the end date for the report.
- Show Parameters
- Select Yes to show the selected parameters at the top of the report.
- Report Format
- Optionally, select the output format of the report (HTML, PDF, or Excel). The default is HTML.
- Click Go to run the report.