Productivity Summary Report

The Productivity Summary Report provides productivity information for a specified location for a given time period. The scheduled productivity (based upon forecast volume, scheduled hours, average hourly rate, and projected payroll) is calculated for both volume per hour and volume per wage dollar. The report will calculate the actual volume per hour, volume per wage dollar, and payroll percentage of volume for each sublocation.