Modifying bid periods

To modify bid periods:

  1. Select Maintenance > Optional Modules > Schedule Bidding > Schedule Bid Setup > Create/Manage Schedule Bid.
  2. Click Edit beside the schedule for which you want to modify bid periods.
  3. In the SB Bid Period section, modify the bid periods, as required.
  4. Click Save.