Defining the search criteria for CUM required history

Use the CUM Required History page to specify the search criteria for the CUM required history details of the part that are displayed on the CUM Required History List page.

To define the search criteria:

  1. Select Demand > CUM Management > CUM Required History. The CUM Required History Search Criteria page is displayed.
  2. Specify this information:
    Facility
    The name of the location from where the demand for the parts is raised.
    Ship To
    The location at which the parts are received.
    Ship From
    The name of the location from where the parts are shipped.
    Part
    The code of the part.
    PO Number
    The purchase order (PO) number associated with the requirement.
    Document Type
    The type of schedule. Possible values:
    • Material Release
    • Shipping Schedule
    From (Date)
    The date from which the schedules with modified CUM Required are displayed.
    To (Date)
    The date up to which the schedules with modified CUM Required are displayed.
  3. Click Continue. The CUM Required History List page is displayed.