Creating staged schedule

Use the Create Staged Schedules page to create a staged schedule for the requirements. You can create the Material Release or Shipping Schedule.

  1. Select Demand > Create Staged Schedules.
  2. Specify this information:
    Supplier
    The name of the supplier responsible for supplying the part.
    Supplier Time Zone
    The time zone in which the supplier is located.
    Facility
    The name of the location from where the demand for the parts is raised.
    Schedule Type
    The type of the document used to publish the requirements. Possible values:
    • Material Release
    • Shipping Schedule
    Ship To
    The location at which the parts are received.
    Release Number
    The release number associated with the purchase order (PO) published.
    Release Date
    The date on which the PO is published.
    Shipment Or Delivery Based
    The option to determine whether the requirement date is when the part must be shipped or delivered.
    Test Or Production
    The type of the part. Possible values:
    • Test
    • Production
    Purpose
    The purpose of the requirement for the parts.
    File Replacement Type
    The option to replace the existing schedules. Possible values:
    • Replace by Facility: The existing schedules for the facility are replaced with the new schedule.
    • Replace by Part: The existing schedules for the combination of the facility and the demand are replaced with the new schedule.
    • Replace by Supplier: The existing schedules for the combination of the facility and the supplier are replaced with the new schedule.
    Purchase Order Number
    The PO number.
  3. Click Save. The Staged Schedules List page is displayed.