Specifying the staged schedule information
Use the Create Staged Schedules page to specify the part information, add, copy and delete the requirement information for the staged schedule.
The information in the Staged Schedule Header Information section is defaulted from the Schedule Information section of the Schedule (Staged Schedules) page.
- Select Demand > Create Staged Schedules.
- Specify the schedule header details in the Schedule Information section.
- Click Add in the Part Information section. The schedule detail page is displayed.
-
Specify this information:
- Part Number
- The code of the part.
- Engineering Level
- The code that indicates the required version of the part.
- Model Year
- The code of the part that indicates the year when the part is used.
- Unit Of Measure
- The unit of measure for the ordered quantity of the part.
- Purchase Order Number
- The Purchase Order (PO) number associated with the requirements.
- Purchase Order Line Number
- The PO line number for the parts associated with the requirement.
- Cumulative Start Date
- The date from which the cumulative quantity of the part is calculated.
- CUM Received
- The total quantity of the part received.
- Part Release Status
- The status of the part at the time of the release. For example, B (balance out) can indicate that the part is being phased out or a F (final code) can indicate that this is the final release for the part.
- Last Ship Date
- The date when the previous shipment for the part is received.
- Last Ship Quantity
- The quantity of the part received in the previous shipment.
- Last Ship Notice
- The code or number of the advance ship notice (ASN) related to the previous shipment for the part.
- Dock
- The code of the dock where the shipment is received.
- Contact Name
- The name of the user associated with the requirements.
- Contact Phone
- The telephone number of the user specified in Contact Name.
- Contact Email
- The email ID of the user specified in Contact Name.
- Contact Fax
- The fax number of the user specified in Contact Name.
- Fabrication Date
- The date from which the fabrication cumulative quantity is monitored.
- Fabrication Cumulative Quantity
- The quantity of the part that the supplier is authorized to have on hand.
- CUM Required Prior
- The total quantity of the part for which the demand is raised prior to the current requirement.
- Material Date
- The date from which the material cumulative quantity is monitored.
- Material Cumulative Quantity
- The amount of raw material that the supplier is authorized to purchase.
- CUM Shipped
- The cumulative quantity of the part that is shipped up to and including the recent shipment, as indicated by the supplier.
- Part Number (New)
- The code of the part.
Note: This field is enabled only if the Part Number field is set to New.
- Part Description
- The description of the part.
Note: This field is enabled only if the Part Number field is set to New.
- Safety Item
- Indicates whether the part is used to manufacture
a component that requires certain safety standards and inspections. Possible
values:
Note: This field is enabled only if the Part Number field is set to New.
- AQP
- Indicates whether the part is an Assured Quality Part (AQP).
Note: This field is enabled only if the Part Number field is set to New.
- Click Add in the Requirement Information section.
-
Specify this information:
- Type
- The type of requirement. Possible values:
- Firm
- Plan
- Immediate
- Backlog
- Frequency
- The period when the part is required. Possible
values:
- Weekly
- Flexible
- JIT (Just-in-time)
- Monthly
- Date / Time
- The date and time when the part is required.
- Quantity
- The quantity of the part required.
- Pull Signal
- The code of the Kanban signal associated with the requirement.
- End Date
- The date up to which the requirement for the part is published.
- Select the check box corresponding to the requirement type and click Copy, to copy the requirement information,.
- Select the check box corresponding to the requirement type and click Delete, to delete the requirement information.
- Click Save. The Schedule page is displayed.
- Click Save. The Staged Schedules List page is displayed.