Specifying the staged schedule information
-
Select Demand > Create Staged Schedules. The Staged Schedule Detail page is
displayed.
Note: You can filter the data based on the information specified in the Search Criteria section.
- Click Add in the Part Information section. The Schedule Detail page is displayed.
- Review the schedule related information in the Schedule Information section.
-
Specify this information on the Part
Information tab:
- Part Number
- The code of the part.
- Engineering Level
- The code that indicates the required version of the part.
- Model Year
- The code of the part that indicates the year when the part is used.
- Unit Of Measure
- The unit of measure for the ordered quantity of the part.
- Purchase Order Number
- The Purchase Order (PO) number associated with the requirement.
- Purchase Order Line Number
- The PO line number for the parts associated with the requirement.
- Cumulative Start Date
- The date from which the cumulative quantity of the part is calculated.
- CUM Received
- The total quantity of the parts received.
- Part Release Status
- The status of the part at the time of the release. For example, B (balance out) can indicate that the part is being phased out or a F (final code) can indicate that this is the final release for the part.
- Last Ship Date
- The date when the previous shipment for the part is received.
- Last Ship Quantity
- The quantity of the part received in the last shipment.
- Last Ship Notice
- The code or number of the advance ship notice (ASN) related to the last shipment for the part.
- Dock
- The code of the dock where the shipment is received.
- Contact Name
- The name of the user associated with the requirements.
- Contact Phone
- The telephone number of the user specified in Contact Name.
- Contact Email
- The email ID of the user specified in Contact Name.
- Contact Fax
- The fax number of the user specified in Contact Name.
- New Part
- Select this check box to indicate that the specified item is new.
-
Specify this information on the Material Release
Information tab.
- Fabrication Date
- The date from when the quantity of parts a supplier is authorized to have on hand, is monitored.
- Fabrication CUM Quantity
- The quantity of the part that the supplier is authorized to have on hand.
- CUM Required Prior
- The total quantity of the part for which the demand is raised prior to the current requirement.
- Material Date
- The date from when the quantity of the raw material for parts, a supplier is authorized to have on hand, is monitored.
- Material CUM Quantity
- The total quantity of the material the supplier is authorized to purchase.
- CUM Shipped (YTD)
- The cumulative quantity of parts that is shipped, including the recent shipment.
-
Specify the information in the Additional Information
section:
Note: The fields are displayed based on the Flex Fields specified on the Company Info Flex Fields page.
-
Click Add on the Requirement Information tab. The
Requirement Information window is displayed, wherein you can
specify the information related to the requirement.
Note: This option is displayed only if the part information is specified and saved.
-
Specify this information in the Requirement
Information window:
- Type
- The type of requirement. Possible values:
- Firm
- Plan
- Immediate
- Backlog
- Frequency
- The frequency at which the part is required.
Possible values:
- Weekly
- Flexible
- JIT (Just-in-time)
- Monthly
- Date / Time
- The date and time by which the part is required.
- Quantity
- The quantity of the part required.
- Pull Signal
- The pull signal associated with the requirement.
- End Date
- The date up to which the requirement for the part is published.
- Click Save. The Requirement Information is saved.
- Click Save. The Schedule Information is saved.