Creating a staged schedule

  1. Select Demand > Create Staged Schedules. The Staged Schedule Detail page is displayed.
  2. Specify this information in the Schedule Information section.:
    Supplier
    The name of the supplier.
    Facility
    The name of the location for which the schedule summary is required.
    Supplier Time Zone
    The time zone in which the supplier is located.
    Schedule Type
    The type of the document used to publish the requirements. Possible values:
    • Material Release
    • Shipping Schedule
    Ship To
    The location at which the parts are received.
    Release Number
    The release number associated with the purchase order (PO) published.
    Release Date
    The date on which the PO is published.
    Shipment Or Delivery Based
    The option to determine whether the requirement date is when the part must be shipped or delivered.
    Test Or Production
    The type of the part. Possible values:
    • Test
    • Production
    Purpose
    The purpose of the requirement for the parts.
    File Replacement Type
    The option to replace the existing schedules. Possible values:
    • Replace by Facility: The existing schedules for the facility are replaced with the new schedule.
    • Replace by Part: The existing schedules for the combination of the facility and the demand are replaced with the new schedule.
    • Replace by Supplier: The existing schedules for the combination of the facility and the supplier are replaced with the new schedule.
    Purchase Order Number
    The Purchase Order number.
  3. Click Save.
  4. Click Add in the Part Information section. The Schedule Information details page is displayed. See:Specifying the staged schedule information
    Note: This option is enabled only when the specified schedule information is saved.
  5. Click Save.
    Note: You can use the Publish option to publish the staged schedule to the supplier.