Defining the landed costs for RFQ line
Use the Landed Costs tab on the RFQ Response page to specify the costs such as the transportation, tooling, labor costs, for the Request For Quotation (RFQ) line.
- Select . The Console page is displayed.
- Specify the information in the Search Criteria section.
- Click . The search results are displayed in the RFQ Supplier Console section.
- Click the option corresponding to the RFQ Number for which a bid must be sent. The RFQ Response details page is displayed.
- Click the Landed Costs tab.
- Select . A window is displayed wherein you can specify the landed costs details such as Landed Costs, Calculation Method, Cost Level, Value.
- Click .