Defining the landed costs for RFQ line
Use the Landed Costs tab on the RFQ Response page to specify the costs such as the transportation, tooling, labor costs, for the Request For Quotation (RFQ) line.
- Select Console page is displayed. . The
- Specify the information in the Search Criteria section.
- Click RFQ Supplier Console section. . The search results are displayed in the
- Click the RFQ Response details page is displayed. option corresponding to the RFQ Number for which a bid must be sent. The
- Click the Landed Costs tab.
- Select Landed Costs, Calculation Method, Cost Level, Value. . A window is displayed wherein you can specify the landed costs details such as
- Click .